Letter to Parliament about the package of measures for construction period of third track on Betuweroute
Letter by the State Secretary for Infrastructure and the Environment: Due to construction of the third track on the Betuweroute, from Zevenaar/Emmerich to Oberhausen, the Netherlands is facing reduced capacity on the Betuweroute from 2015 to 2022.
A package of measures has been developed, which consists of different categories:
- Rerouting;
- Preconditional measures;
- Measures to improve the capacity utilization;
- Other measures.